How long does a full house renovation take

Droitwich Editorial 5th Apr, 2024   0

Planning a full house renovation can be a really exciting and rewarding experience as it transforms your living space into a dream home. But, the long duration of construction work involved in it seems frightening. That’s why it’s crucial to understand the timeline for a full house renovation first so that you can do proper planning.

In this comprehensive guide, we have discussed the several factors that influence the timeline of the construction work, the stages involved, and tips to go seamlessly.

Factors Influencing Renovation Timeline

The duration of your full house renovation is based on a lot of factors. The following are the most crucial things to consider:

  • Size and Complexity of the House: If your house is a two-storey building with elaborate detailing, it will normally take longer time to renovate in comparison with a smaller house. Also, it depends on the current structure complexity, if the changes that need to be made are extensive, then the time will be more.
  • Scope of Renovation: To what extent do you want your house renovation to affect the timeline? For simple kitchen remodeling, less time will be taken as compared to redoing every room of your house such as electrical stuff, plumbing, and some additions.
  • Availability of Materials and Labor: Sometimes, the labor or materials fall short. In that case, the process will be delayed to complete the construction work.
  • Unforeseen Issues or Delays: When you tear everything down, you get to know about certain hidden issues, such as broken wires and structural weaknesses, that need extra time to address these problems.

Preparing for Renovation

Before diving into the process, detailed preparation is key to making the process run smoothly and lessening any delay. Let’s understand what you need to consider:




  • Initial Consultation and Planning Phase: For an initial consultation, connect with expert contractors and architects to discuss your plan, requirements, and overall budget. If you want a big house with a variety of tricky detailing like rich designs, then the duration might extend. So, make a thorough plan that mentions the scope of work.
  • Obtaining Necessary Permits and Approvals: For your home renovation project, you may need some permits for it. Contact your local building department to know the requirements. Add up the processing time for permits in your entire renovation timeline.
  • Setting a Realistic Budget and Timeline: Work closely with your contractor to form a meticulous and transparent budget with labor costs, material costs, permitting fees, and a contingency fund for future expenditures. So, be practical with the timeline and add time for any future delays in your timeline.
  • Selecting Contractors and Scheduling Work: There are specific areas involved in construction that demand expert contractors, such as carpentry, plumbing, and electrical. Schedule the different stages of work before the contractors are onboard to ensure a seamless process with low downtime.

Phases of a House Renovation

Fully renovating a house occurs in different stages, each with a particular timeline. Let’s understand the phases involved:

  • Demolition and Preparation: In this phase, certain unwanted features, such as outdated fixtures, walls, and floors, are removed. If there are some harmful substances, firstly get rid of them.
  • Structural Work and Major Renovations: If your house is demanding major structural changes like adding an extension, loading bearing wall, or knocking down walls, it might add up time. However, the complexity of the construction will tell the precise duration.
  • Electrical, Plumbing, and HVAC Installations: This is considered a tough phase that takes around 4-8 weeks of time period. Things like installing new electrical wiring, ventilation, heating, plumbing, or air conditioning systems inside the house are taken care of.
  • Insulation and Drywall: Consider insulation that keeps your house cool or warm for good energy efficiency. After that, hanging and finishing drywall sheets are considered to prep the walls and ceilings for further painting. This process takes around 2-4 weeks.
  • Flooring, Cabinetry, and Fixtures: This stage includes new flooring everywhere in the house by adding custom cabinets or built-in shelving in bathrooms or kitchens. In this phase, some fixtures are also added, like light ones, towel racks, and faucets. Yet, the time taken will be decided on the complexity of the situation. Generally, it takes around 3-6 months to finish the procedure.
  • Painting and Finishing Touches: In the last stage, the walls and ceilings are painted, wallpaper, if needed, and every sort of small touch-up work during final inspections. Usually, it takes around 1-2 weeks of duration.

Estimated Timeline for Different Renovation Projects

  • Medium-scale Renovations: If you plan to renovate multiple house rooms, such as living area, bathroom or kitchen, it will take extra time compared to a single room. The time taken is around 6-12 months, depending on the work’s complexity.
  • Large-scale Renovations: In case of renovating your entire house includes modifying everything or adding big rooms from plumbing to electricity, it could take 12 to 18 months or even more.

Managing Delays and Unforeseen Issues


Sometimes, the most thoroughly planned full house renovation can experience delays. Here’s how to handle these challenges effectively:

  • Common Challenges During Renovation: In case of any shortage in materials or labor, bad weather conditions and delays in permission are some common issues you might face.
  • Strategies for Minimizing Delays and Staying on Schedule:
  • Talk openly and regularly with your local contractor, discuss the future delays that may come, and form contingency plans to lessen their impact. However, it’s a good idea to add some extra time to your timeline for any future situations.
  • Communication with Contractors and Flexibility in Planning: Maintaining clear communication with your contractor and setting up regular meetings is crucial. This helps in knowing early about the potential issues and gives time for solutions. Also, the process should be flexible to adapt to any future circumstances.

Conclusion

Understanding the overall timeline to renovate a house is empowering. If you plan everything well in advance, set realistic expectations, and communicate openly with your contractor, you can manage the entire procedure confidently. Even if there are delays, you need to be prepared to deal with every one of them and get your construction done on time. Keep in mind to be patient and flexible in the process. So, embrace the process and soon you will live in a new house full of positivity.

Buy Photos

Buy photos online from the Droitwich Standard newspaper.

Advertising

Advertise with the Droitwich Standard to reach your audience

Announcements

Weddings, Birthdays, Bereavements, Thank you notices, Marriages and more.

Subscribe

Receive a weekly update to your inbox by signing up to our weekly newsletter.